How We Transported Four 85 MT Transformers to Hassyan Power Plant

This project details the careful logistics required to deliver four massive transformers. Our team successfully received these units directly from a vessel at Jebel Ali Port. We then transported them to the Hassyan Power Plant. This plant is a major 2.4GW gas fired facility on the Arabian Gulf coast. It plays a huge role in local energy security and supports the local Clean Energy Strategy 2050.

Why does moving 85 MT transformers demand expertise?

Transformers are critical for power generation. They are extremely heavy and contain sensitive internal parts. A single unit weighs 85 metric tons and stands 4.1 meters high. Moving four of these massive units requires careful planning to prevent any damage during transit.

Length: 6.5 meters
Width: 3.2 meters
Height: 4.1 meters
Quantity: 4 Units

Standard flatbed trucks cannot carry an 85 ton load. We used specialized hydraulic multi axle trailers to move these heavy units from the port to the power plant.

  1. Direct Vessel Receiving: We received the cargo right from the ship crane to minimize handling risks.
  2. Secure Port Stooling: We carefully rested the transformers on strong steel supports inside the port storage area until the site was ready for delivery.
  3. Precision Transport: Our expert drivers used hydraulic multi axle trailers to keep the heavy cargo perfectly balanced on the road.

The success of this power plant delivery relied on exact timing and expert heavy lift engineering.

This successful operation highlights the deep expertise of Three Lines Shipping in handling technically demanding heavy lift projects. We draw on over 20 years of specialized experience in project logistics. Our dedicated team consistently provides safe and on time solutions for the most complex cargo movements across the region. We ensure that your valuable industrial assets are transported with total precision and operational excellence.

Frequently Asked Questions on Crane Logistics

Let's Talk!

Get in touch with our team for all your queries.

Our Newsletter

Signup for Industry alerts, News & Insights

How We Transported 70 Ton CO2 Storage Tanks to Hassyan Power Plant

Reading Time: 2 minutes

How We Transported Four 85 MT Transformers to Hassyan Power Plant

Reading Time: 2 minutes

How We Jacked Up and Transported a 90 Ton Manitowoc Lattice Boom Crawler Crane

Reading Time: 2 minutes